TECEZE transformed Old National Bank’s network across 75 locations, coordinating 150 engineers for a single-weekend cutover The rollout achieved 100% SLA attainment with zero missed change windows
Old National Bank (ONB) is a leading U.S. financial institution that undertook a large-scale network transformation across 75 locations in the United States. Infosys served as the Global Systems Integrator (GSI), with TECEZE responsible for last-mile service delivery, physical execution and hypercare
creating operational friction and increasing project risk. Site activities lacked proper planning and sequencing, while insufficiently skilled engineers and late arrivals disrupted scheduled change windows
The engagement also lacked strong project management oversight, resulting in missed deliverables and slipping milestones. With 75 sites requiring coordinated execution, ONB and Infosys needed a delivery partner capable of managing resources, readiness, execution and stabilisation with clear ownership
TECEZE implemented a tightly governed rollout model in lockstep with Infosys and ONB, combining dedicated project management, detailed site planning, skilled field resources and real-time quality tracking.
The approach included:
A single, accountable TECEZE Project Manager orchestrated end-to-end delivery, including planning, scheduling, risk and issue management, resource coordination and stakeholder updates.
Detailed runbooks and site-by-site plans were developed with ONB and Infosys, aligning change windows, access requirements, success criteria and rollback safeguards before execution.
Skilled engineers were assigned across survey, staging, physical installation, cutover and hypercare workstreams. The project manager coordinated dispatch, readiness and daily stand-ups to maintain delivery quality and pace.
Network site surveys, remote staging and configuration, physical installation, controlled cutover and structured hypercare were delivered using standard checklists, proven playbooks and validation processes.
Deliverables were tracked in real time, with quality checks at each stage to support first-time-right execution and on-time completion. This structured approach provided clear visibility across the rollout and helped maintain control through cutover and hypercare.
| Focus | Activity | Outcome |
|---|---|---|
| Project Management | End-to-end planning, scheduling, risk and resource coordination | Single-point accountability across delivery |
| Joint Planning | Site-by-site runbooks, change windows and rollback planning | Execution readiness across all 75 sites |
| Field Delivery | Skilled engineers across survey, staging, installation and cutover | Consistent, first-time-right execution |
| Quality & Tracking | Real-time progress monitoring and stage-level quality gates | On-time completion with clear delivery visibility |
| Hypercare | Post-cutover stabilisation and documented handover to BAU | Controlled transition into steady-state operations |
“TECEZE’s coordinated execution helped us deliver the 75-site transformation with 100% SLA attainment and no missed change windows.”
— IT Service Delivery Lead, Old National Bank
TECEZE worked in close coordination with Infosys, the Global Systems Integrator, and Old National Bank to execute the network transformation across 75 sites. TECEZE served as the Last Mile Service Delivery Partner, taking responsibility for on-the-ground execution, engineering resources, physical installation, cutover coordination and hypercare.
A dedicated TECEZE Project Manager provided central ownership across planning, scheduling, readiness, risk management and field execution, enabling Infosys and ONB to operate against a common delivery plan.
Following the successful cutover, the focus shifts to sustaining operational stability and creating a repeatable model for future multi-site network changes.